< Back to list of FY 2007-2009 projects
200707000 - Fish Passage Facility Final Design and Construction - Clear Lake Dam (NF Tieton R.)
Sponsor: Washington Department of Fish and Wildlife (WDFW)
Budgets: FY07: $0 | FY08: $0 | FY09: $1,930,000
Short description: Complete value engineering study, final design, acquire environmental permits and construct a fish ladder and temperature control curtain at Clear Lake Dam; restore habitat diversity, productivity, and extend the range of bull trout. Cost share with USBR.
Final Council recommendation (Nov 2006)
Funding category: Expense
Recommended budgets: FY07: $0 | FY08: $0 | FY09: $0
Comment:
ISRP final recommendation: Fundable (Qualified)
Comment:
The sponsors of this proposal provided adequate responses to most ISRP comments and recommendations. The details regarding the snorkeling surveys and the habitat descriptions from the USFS were welcome additions. The ISRP rates this proposal as Fundable with two qualifications. 1) One outstanding issue is the assumption that brook trout populations in the upper Tieton River won't hinder establishment of bull trout above the dam. This should be viewed as a hypothesis to be tested. There are cases from elsewhere that indicate brook trout can have a major, negative effect on bull trout. The collection of samples for genetic analysis partly addresses this question (hybridization), but competitive interactions will not be directly assessed. Inclusion of an element in the M&E to address bull-brook trout interactions other than hybridization would strengthen this component of the project. 2) In response to the ISRP's request for a description of plans for bull trout population M&E of fish ladder use, the sponsors did indicate that an interagency work group, the Yakima Fish Passage Work Group, will develop a passage evaluation project if funding is available. However, this monitoring and evaluation plan of ladder use and passage effectiveness (including fallback rates) is critical in determining the success of the project and should be an integral part of this proposal.
Response loop edit
See the sponsor's revised proposal from the response loop. You'll be taken to CBFWA's proposal system in Section 10 where most sponsors uploaded revised narratives or other responses to the ISRP comments.
State/province recommendation: Washington
Review group: Washington list
Recommended budgets: FY07: (n/a) | FY08: (n/a) | FY09: (n/a)
Comment: See Washington guidance